Narbonne A9 junctions temporarily closed

456

Work on the A9 interchange in Narbonne is causing temporary closures.  Vinci Autoroutes is undertaking renovation work on the entrance and exit ramps of the Narbonne Est interchange (No. 37) on the A9 motorway. From Monday 3 to Wednesday 12 June, there will be intermittent temporary closures of the interchange and a speed limit.

The new surface will offer enhanced grip and greater driving comfort, even in rainy weather, says Vinci.

The type of asphalt used during this project consists of grains with a reinforcements that promotes adhesion for greater safety.

– Night closing of the entrance and exit ramps at Narbonne is from Monday, June 3rd to Wednesday, June 5th, from 9pm to 7am:
Drivers driving on the A9 in the direction of Beziers / Narbonne and wishing to go out in Narbonne will have to use the Narbonne Sud interchange (n ° 38)
Drivers wishing to join the A9 from Narbonne Est will be directed to the Narbonne Sud interchange (No. 38), using the deviation set up by the city centre.
– Night closing of the entrance ramps in Narbonne is from Wednesday June 5th to Friday June 7th, from 9pm to 7am:
Drivers wishing to join the A9 from Narbonne East will be directed to the Narbonne Sud interchange (No. 38), taking the deviation through the city centre.
– Night closure of the exit ramp of Narbonne is from Tuesday, June 11 to Wednesday, June 12 from 21:00 to 7:00.
Drivers driving on the A9 and wishing to exit at Narbonne East will have to use the Narbonne Sud interchange (n ° 38).

As part of the work on the interchange, the parking entrance will be closed until Wednesday, June 12 at 12h.

Source: France 3